Gas Utilization

Supplier for Electrical Engineering

The Bouri GUP Base Case 42% CO2 consist of a gas recovery module (GRM) being installed on the DP4 platform alongside a series of essential brownfield modifications and upgrades to both DP3 and DP4. Raw gas taken off the DP3 separator will be transferred to DP4, via a new 14″ x 8km Inconel clad pipeline. The pressurized raw gas from DP4 is transferred to Sabratha platform (via a new 10″ x 20km carbon steel pipeline) for onward export to Mellitah onshore plant via an existing 36″ x 110km pipeline.

The main drivers and targets of this project are:

  • ZERO PROCESS FLARING BOURI Field within 2025.
  • VALORIZATION of associated gas of Bouri and maximize the recovery of Bouri reserves.
  • MAXIMIZE use of previous studies and past experience of the Project.
  • ASSURE proper QRA Risk level on DP4.

MAXIMIZE use of equipment/material already procured as company provided Items during the original BGUP project.

COMPANY: Mellitah Oil & Gas B.V., Libyan Branch

CONTRACTOR: SAIPEM S.p.A.

NOMINATED SUB-CONTRACTOR: Rosetti Marino SpA (EPCC SUB-CONTRACTOR)

SUPPLIER FOR ELECTRICAL ENGINEERING: E-TEC ENGINEERING S.R.L.

BUDGET ORE: 13.000h

Activities

  • DESIGN CRITERIA
  • ELECTRICAL DIAGRAMS
  • REPORTS CALCULATION
  • TECHNICAL SPECIFICATIONS
  • MATERIAL REQUISITION (MR)
  • TECHNICAL BID EVALUATION (TBE)
  • MATERIAL TAKE OFF (MTO)
  • DRAWINGS
  • TYPICAL INSTALLATION DETAILS
  • VENDORS FOLLOW-UP
  • 3D MODELLING